Bulldog CRW was hired to install a waterproofing membrane in each change room chalet along the Rideau Canal, prior to installing the rubberized protective flooring.
Bulldog CRW applied epoxy, acrylic, and polyurethane injections to concrete slabs and walls at the new power generation facility. This work reinforced the structure and stopped water from leaking through hairline cracks.